Case Studies & Solutions
Sponsored Content
What it really means to have a wrench thrown into your plans
When a wrench fell 220 feet into a Houston facility’s steam drum line, TEAM used advanced inspection technology to retrieve it in just five hours, preventing costly downtime.
May 6, 2026
When catastrophe hits and the plant is still running: The real complexity of emergency demolition
Nobody schedules an emergency. That is what makes demolition work inside a live refinery or chemical plant, under emergency conditions, one of the most demanding scopes in the industrial services sector.
May 6, 2026
Simplifying turnarounds: Why more refiners are turning to integrated service partners
If you’re looking to simplify your next turnaround and reduce the burden of managing multiple contractors, it may be time to explore a more integrated approach.
May 6, 2026
Managing fired heater hot spots - Detection, risk and online repair strategies
Hot spots in fired heaters are often an early warning of failure that can escalate rapidly into a significant operational and financial risk.
May 6, 2026
6 reasons why the ALTAIR io™ 6 is your ultimate sampling tool
Whether used in utilities, manufacturing plants, emergency response units, or construction sites, the ALTAIR io 6 is built to perform shift after shift.
May 5, 2026
Aecon: Self-perform industrial construction, fabrication and modularization for refineries and chemical facilities across the U.S. Gulf Coast
Aecon helps create sustained opportunities that support the local economy while delivering safe, high-quality outcomes for industrial owners and operators.
May 4, 2026
Airin’ sludge: ‘Small ball,’ 190-ton AT aids Georgia wastewater plant expansion
Plant work often requires large, high-capacity cranes because lifting is needed in a hard-to-reach spot. The big lift equipment sets up far away, extends a long boom, and reaches over anything standing in the way.
May 1, 2026
Cutting turnaround downtime: How rapid chemical contamination is reshaping refinery execution
At the center of this challenge is a critical—but often underestimated—phase of the turnaround: decontamination.
Apr 29, 2026
Why construction’s top players are moving toward scalability
By treating indirect services as a strategic blueprint rather than a collection of rentals, owners can build jobsites that are faster to deploy, safer to operate, and significantly more cost-efficient.
Apr 27, 2026
Ericson is solving one of data center construction’s biggest bottlenecks – Temporary power and lighting
Because in the race to build the digital backbone of the future, the projects that win are the ones that start faster, move smarter, and never lose power.
Apr 22, 2026