The 2017 Construction General Permit (CGP) is now in effect. The revised CGP was issued by the EPA Jan.11. The 2017 CGP replaces the 2012 CGP.The permit includes stormwater runoff from construction sites that disturb one or more acres, or sites that are a part of a larger common plan of development. The 2017 CGP will last for five years.
For more information, visit www.Epa.gov or call (202) 564-4700.